Sl.
No.
 
NAME OF THE WORK
 
CLIENT
Consultancy Fees (in Lakhs)
 
1
Engagement of consultancy firm for Authority’s Engineer for supervision of the work, execution of 04 nos of individual rural piped water supply project pertaining to Jajpur / Keonjhar / Sundargarh district.
ENGINEER-IN-CHIEF
Rural Water Supply & Sanitation, Odisha
 
662.13
 
2
Engagement of consultancy firm for Authority’s Engineer for supervision of the work, execution of 05 nos of individual rural piped water supply project pertaining to Nuapada district.
ENGINEER-IN-CHIEF
Rural Water Supply & Sanitation, Odisha
 
592.96
 
3
Survey and Planning of Micro Irrigation and Drainage Net-works in the Command Area of Different Canals of Baghua, Badanala,Bahuda,
Khadkhai, Upper Jonk, Derjanga Medium Irrigation Project.
JOINT DIRECTOR
Survey and Planning, Odisha
 
321.54
 
4
Survey for Fixing of Alignment of Bankatira Main Canal with its Minor and Sub Minors.
EXECUTIVE ENGINEER,
Balasore Irrigation Division
 
47.23
 
 
5
Preparation of DPR for Minor Irrigation Projects in Cluster No – I, II, III, IV, V, VI & for Medium Irrigation Project in Cluster No – VII under Odisha Integrated Irrigation Project for Climate Resilient Agriculture (OIIPCRA) assisted by World Bank
 
Odisha Construction Corporation Limited
 
 
35.84
 
6
Preliminary Survey & Investigation for Preparation of Feasibility Report at Godhaneswar Barrage in the river Mahanadi.
Odisha Construction Corporation Ltd
 
28.21
 
 
 
Sl.
No.
NAME OF THE WORK
CLIENT
Consultancy Fees (in Lakhs)
7
SurveysandPreparationofDPRsforUp-Gradationofroads170.35Kmand for New Connectivity 152.00Km
SUPERINTENDING ENGINEER,
PMGSY CIRCLE, J & K
63.11
 
8
Preparation of Detail Project Report (DPR) for the work widening & strengthening of different roads in the district of Keonjhar, Odisha
(Total = 236Km)
EXECUTIVE ENGINEER,
Ghatagaon (R&B) Division
 
60.10
 
9
Consultancy Services for Feasibility Study and Detailed ProjectReport (DPR)PreparationfortheworkWideningof2Laneofexistingroadto4- LanefromBankibahaltoKanikaRailwaySidingfrom0/000Kmto30/700
Km. (Total = 30.700Km)
 
EXECUTIVE ENGINEER,
Sundargarh (R&B) Division
 
33.65
10
Topographical Survey Investigation and Preparation of Project Proposals for ADB Trench – I, II & III in the District of Khurda. (Total = 84 Km)
EXECUTIVE ENGINEER,
Rural Works Division, BBSR
12.60
 
11
DesignDirectorforWideningandStrengtheningofKaramdihiTalsara
LulkidihiRoad(SH-24)totwolaneswithoutpavedshoulderfrom0/000to 9/000Km,9/880to10/734Km,12/462to14/622Km&15/600to23/620Km.
Shree Balaji Engicons Pvt.
Ltd., Odisha
 
20.00
 
12
Proof&SafetyConsultantforWideningandStrengtheningofexistingS/L, I/L&D/LtoTwoLanewithPavedShoulderfromKm246.100to321.000Km
of NH-53 in the State of Odisha on EPC Mode.
CHIEF ENGINEER
NATIONAL HIGHWAYS, ODISHA
 
10.50
 
13
Proof&SafetyConsultantforWideningtheexisting2-Laneto2-Lanewith paved shoulder from Km 181/000 to 239/280 (Bhawanipatna toKoksara)
NH-26 in the State of Odisha on EPC mode.
CHIEF ENGINEER
NATIONAL HIGHWAYS, ODISHA
 
10.20
 
14
Survey&InvestigationworkforImprovementtoBalipalCHoumukharoad fromCh0/0Kmto8/0Km,DaradaSahadaKundali-Sartharoadfrom Ch0/0Kmto9/0KmandJamsuli-LangaleswarroadfromCh0/0Kmto
8/7 Km under NABARD Assistance (RIDF-XXI) (Total = 25.7 Km)
 
EXECUTIVE ENGINEER,
Balasore (R&B) Division II
 
6.54
Sl.
No.
NAME OF THE WORK
CLIENT
Consultancy Fees (in Lakhs)
15
Third Party Quality Monitoring for Construction of different tower sites in the state of Odisha.
Bharati Infratel Limited
148.83
16
Topographical Survey and Geotechnical Investigation for Construction of High Level Bridges in the state of Odisha.
BANSAL Infra Projects Pvt.
Ltd.
68.14
 
17
Geotechnical & Topographic Survey for 100 bedded & 50 bedded MCH Building at various district hospital (Chhatishgarh)underNationalRuralHealthMissionScheme.
 
HSCC (INDIA) LIMITED
 
27.24
 
18
Topographical Survey and Geotechnical Investigation for Construction of High Level Bridges in the district of Keonjhar,
Odisha. (Total = 10 Nos)
EXECUTIVE ENGINEER,
Ghatagaon (R&B) Division
 
24.16
 
19
Preparation of DPR of Proposed H.L. Bridge over river Mahanadi connecting to village Chikhili –Kanaktora (NH-
200) road at 21/800 Km in the district of Bargarh, Odisha
Length – 1280.84 Mtr., No of Span – 41Nos
 
EXECUTIVEENGINEER,
Bargarh (R&B)Division
 
12.92
 
20
Execution of Soil Investigation Work in connection withproposed3rd Line work between Rourkela & Sogra of Rourkela – Jharsuguda and Chakradharpur – Goikera 3rd
Line.
 
South Eastern Railway
 
14.14
21
Geotechnical Study of Pipeline Corridor for Mine void fillingof NTPC-Kaniha
NTPC Limited
13.98
 
23
Hydraulic Particulars work for Construction of H.L. Bridge overriverTantighai&KharasrotaonnewlytransferredMDR
14MarkandpurviaBandhamundaRoadinthedistrictof
Jajpur.
 
SUPERINTENDING ENGINEER,
Cuttack (R&B) Circle
 
11.63